Ganga Expressway GK Quiz: The ganga expressway is one of the most important road projects in Uttar Pradesh. It has been launched by Prime Minister Narendra Modi and is becoming a key topic for students preparing gk questions on ganga expressway and competitive exams. This expressway is part of the gk Quiz on ganga expressway India’s Longest 594-km Corridor from Meerut to Prayagraj.
The expressway is about 594 km long and connects Meerut to Prayagraj, making travel faster, safer, and more comfortable. Built at an estimated cost of ₹36,230 crore, this project plays a big role in improving transport, trade, and economic growth in the state. It will reduce travel time between cities and help in better connectivity across regions.
One of the most unique features of the ganga expressway is its airstrip facility, where aircraft can land and take off during emergencies. This makes it special compared to other highways in India. High-speed vehicles, modern safety systems, and smart road design are also part of this project.
This topic is very useful for students studying gk on ganga expressway, as it covers important facts about infrastructure, development, and transportation in India. Understanding this expressway helps in building strong general knowledge for exams and quizzes.

Ganga Expressway GK Questions with Answers
Ques: What is the total length of the Ganga Expressway?
Ans: 594 km
Ques: Which two cities are connected by the Ganga Expressway?
Ans: Meerut and Prayagraj
Ques: How many lanes are initially planned on the expressway?
Ans: 6 lanes
Ques: To how many lanes can the expressway be expanded?
Ans: 8 lanes
Ques: Which organization is responsible for the project?
Ans: Uttar Pradesh Expressways Industrial Development Authority (UPEIDA)
Ques: What is the estimated cost of the project?
Ans: ₹36,230 crore
Ques: In which state is the Ganga Expressway located?
Ans: Uttar Pradesh
Ques: What type of project is the Ganga Expressway?
Ans: Greenfield expressway
Also Check – GK Quiz on NHAI with Answers
Ques: When was the expressway inaugurated?
Ans: 29 April 2026
Ques: Who laid the foundation stone of the project?
Ans: Narendra Modi
Ques: From which location in Meerut does the expressway start?
Ans: Bijoli
Ques: Where does the expressway end in Prayagraj?
Ans: Judapur Dandu (NH-2 bypass)
Ques: How many districts does it pass through?
Ans: 12 districts
Ques: Approximately how many villages are covered?
Ans: Around 519 villages
Ques: Which river does the expressway follow?
Ans: Ganga River
Ques: How many rivers and wetlands does it cross?
Ans: About 140
Ques: What is the right-of-way width of the expressway?
Ans: 120 meters
Ques: What is the approximate service road width?
Ans: 3.75 meters
Ques: Which major city in eastern UP is connected by this expressway?
Ans: Prayagraj
Ques: Which region benefits from improved connectivity?
Ans: Western and Eastern Uttar Pradesh
Ques: In which year was the original concept announced?
Ans: 2008
Ques: When was environmental clearance granted?
Ans: November 2021
Ques: When was the foundation stone laid?
Ans: 18 December 2021
Ques: When was land acquisition completed?
Ans: April 2024
Ques: What percentage of structures were completed by mid-2025?
Ans: Around 90%
Ques: What delayed the project timeline?
Ans: Monsoon rains
Ques: What was the initial target for completion?
Ans: Kumbh 2025
Ques: When was the expressway opened to the public?
Ans: April 2026
Ques: For how many days was the toll initially waived?
Ans: 15 days
Ques: What type of project execution model was used?
Ans: PPP (DBFOT)
Ques: What does DBFOT stand for?
Ans: Design-Build-Finance-Operate-Transfer
Ques: How much land was acquired for the project?
Ans: About 18,000 acres
Ques: How many farmers contributed land?
Ans: Around 1 lakh farmers
Ques: What compensation was given to rural landowners?
Ans: Up to 4 times the circle rate
Ques: What is the approximate land acquisition cost?
Ans: ₹7,500–9,000 crore
Ques: Which companies developed the expressway?
Ans: IRB Infrastructure and Adani Enterprises